We updated the plumbing layout to suit the new bathroom design, adjusting pipework for the new bath/shower and basin positions before installing and connecting the new toilet, basin, taps, and shower fittings. Once everything was in place, we checked water pressure and flow, fully tested the system for leaks, and finished with a tidy clean-up so the space was left ready for the next stage of the project.